Weekend works news for January 2020
SRM will be erecting a Tower Crane on Saturday (25th) and Sunday (26th) January 2020 between the hours of 8am and 6pm. The tower crane will be located between the two hospitals near the current nursery (refer to attached drawing). For the majority of works noise levels will be minimal with the exception of pin installation which will require hammering, this however will be intermittent. Wandsworth Council have been advised accordingly.
In addition, cabin installation will continue this Saturday (18th) between the normal permitted working hours of 8am and 1pm. Works are located in the compound area of site adjacent to Burntwood Lane. Noise levels generated are anticipated to be minimal.