Weekend works 6th and 7th November

Sir Robert McAlpine need to dismantle and remove one of the materials hoists within Shaftesbury (Forensic) Building. This will include the use of 2 forklifts, one tower crane and a lorry. The bulk of the noisy work will be carried out on Saturday. Also the hoist is located within the building so the building will act as a noise barrier.  

Sir Robert McAlpine will carry this out on the 6th and 7th November from 8am - 4pm on Saturday and 9am - 5pm on Sunday. The works require a large exclusion zone due to lifting of heavy sections overhead which requires most of the building to be shutdown.  

Noise will be kept to a minimum. We apologise for any inconvenience caused.

Lisa Baker